Oil & Gas, Industrial and Mining
SCARBOROUGH FPU
THE PROJECT
An integrated floating production unit, this world class facility is designed to be controlled from onshore with minimum manning offshore. Our team worked through all phases of the HVAC project from FEED, Engineering, Procurement and Manufacture, Testing, Construction Supervision and Commissioning.
DELIVERABLES
- Turnkey HVAC Package
- Integrated PLC systems
- Living Quarters
- Topsides
- Hull
SOLUTION
- Chillers
- Air Handling Units
- Fans
- HVAC UCPs
- VSDs
- Dampers
- Pumps
- Instrumentation
- Air Diffusion