Engineering the benchmark

News

POSTED ON 15 February

Karratha Gas Plant (KGP)

THE PROJECT One of the most advanced, integrated gas production plants in the world, located near Karratha, Western Australia. MIZCO delivered engineering and HVAC equipment, across 3 Campaigns for renewal of aging equipment including Chillers, Package Units and PLC systems across more than 37 locations around the gas plant.DELIVERABLES Integrated PLC systems for HVAC substations,...

Read more

POSTED ON

SCARBOROUGH FPU

THE PROJECT An integrated floating production unit, this world class facility is designed to be controlled from onshore with minimum manning offshore. Our team worked through all phases of the HVAC project from FEED, Engineering, Procurement and Manufacture, Testing, Construction Supervision and Commissioning.DELIVERABLES Turnkey HVAC Package Integrated PLC systems Living Quarters Topsides Hull SOLUTION Chillers...

Read more

POSTED ON 27 October

Moora Residential College

THE PROJECT Moora is a key regional town located 177km north of Perth in the Wheatbelt region of Western Australia. Moora Residential College is an educational facility with boarding accommodation to students coming from pastoral and coastline communities around Moora while some come from as far as Marble Bar. As part of addition & alteration...

Read more

POSTED ON 21 October

Westin Hotel

THE PROJECT Built by BGC and operated by the Starwood Group, the 368-room, five-star Westin Hotel is located in the heart of the Perth CBD. Mizco was brought in to assist with employing the latest technologies across the hotel, along with its mixed-use and retail development aspects – including restaurants, spa and fitness facilities. Our...

Read more

POSTED ON

Gorgon

THE PROJECT One of the world’s largest natural gas projects, the Gorgon mine site is located on an environmental A Class reserve off the Pilbara coast of Western Australia.   This remote project required our team to deliver the integrated controls and fibre-optic cabling for the HVAC systems across the administration, laboratory, workshop and warehouse buildings....

Read more

POSTED ON

Martin Linge

THE PROJECT An integrated wellhead, production and accommodation platform, this world-class facility is designed to be controlled from land with limited staff offshore. Our teams worked through all phases of the large-scale project, from FEED through to commissioning in Australia, Korea, Sweden and Norway over the last five years – using the Siemens S7 PLC...

Read more

POSTED ON

QEII Central Energy Plant

THE PROJECT QEII is a world-class medical centre in Perth. As part of its ongoing upgrade and refurbishment, the Central Energy Plant was relocated to make way for hospital expansion. The client brought in Mizco to ensure all systems were upgraded to the latest technologies and that the new build would be completed successfully.   DELIVERABLES...

Read more

POSTED ON

Curtin University

THE PROJECT Curtin University is one of Western Australia’s leading academic institutions. As part of the university’s ongoing sustainability program, Mizco was contracted to upgrade their Central Heating and Cooling Plant. DELIVERABLES Operational Costs Analysis & Energy Savings Implementation Control Systems Integration Building Management System (BMS) Design, Installation, Integration & Commissioning HVAC Electrical Design &...

Read more

POSTED ON

Confidential

Our Capabilities Mizco is a Defence-approved supplier and contractor, with the in-house expertise and capabilities to assist organisations within the Defence sector throughout Australia. From front-end engineering and design, to manufacturing, construction, commissioning and service, our specialised teams can handle projects of all sizes and complexities. Our highly-qualified and experienced engineers and technicians understand the...

Read more

POSTED ON

West Kimberley Regional Prison

The Project Mizco was contracted to assist with the HVAC and BMS needs of this new correctional facility, along with 22 accommodation buildings and multiple administration and recreational facilities for the site.  This project was delivered on time and within budget, despite its remote location, with all products and deliverables handled by our team.  Deliverables...

Read more

POSTED ON 19 September

one40william

Mizco designed and installed a complete access control and 200-camera CCTV system across this multi-level, commercial and retail precinct. The goal was to enable its multiple Government tenants to transition to one access control card system.  Our team was able to deliver a tailored, turnkey solution resulting in a secure building with a single operating...

Read more

POSTED ON

BHP South Flank

THE PROJECT This new mine site for BHP is located 130km north-west of Newman. Mizco was contracted by the site EPC to provide the installation and commissioning for various HVAC systems across the administration buildings.   Our teams mobilised equipment and spares to carry out the works required across the temporary administration building facilities during the...

Read more